HOTELS CITY
FACT SHEET
Project Name | Hotels City |
---|---|
Project Type | 333 Hotels Buildings |
Project Class | Product |
Country | Worldwide |
Governorate | Worldwide |
City | Worldwide |
Plot Number | – |
Land Area (Sq. M) | 503,865 |
Project Status | Concept |
Project Concept | 4 Floors Hotel |
Year Of Built / Start | – |
Year Of Completion | – |
Grand Floor Area (GFA) | 378,201 |
Net Sellable Area | 258,201 |
Floor Area Ratio (FAR) | 0.51 |
Building Height | 22 |
# Of Floors | 4 |
# Of Buildings | 333 |
# Of Apartments | |
# Of Offices | |
# Of Retails | 165 |
# Of Hotel Rooms | 3,333 |
# Of Parking Spaces | 3,498 |
Project Official Website |
PROJECT DESCRIPTION
hotels city is a one of a kind project where you can have a great time in a sea side view and choose between variety of choices in your hotel style from american to asian- a world wide variety.
what we thrive for is to give a full experience to whom is willing to enjoy their time in a zero pollution environment with the underground car parks. certainly a place to enjoy your time. couple steps to the beach
PROJECT GOOGLE MAP LOCATION
PROJECT TEAM
Architecture | Dimensions |
---|---|
Engineering Consultant | |
Project Management | |
Sub Contractor 1 | |
Sub Contractor 2 | |
Sub Contractor 3 | |
Sub Contractor 4 | |
Sub Contractor 5 | |
Marketing & Sales Agency | @SALE |
Property Management | @FM |
PROJECT COSTS
NAME | COST |
---|---|
Construction Cost | $453,841,200 |
Project Sales Revenues | $907,682,400 |
Project Yearly Rent Revenues | – |
@DEVELOP Management INVOICE
ITEMS | PRICE | PERCENTAGE |
---|---|---|
1- Evaluation | $317,689 | 0.07% |
2- Design | $20,422,854 | 4.50% |
3- Planning | $771,530 | 0.17% |
4- Organization | $2,768,431 | 0.61% |
5- Financing Management | $9,076,824 | 2.00% |
6- Execution as PM & CM | $10,211,427 | 2.25% |
7- Marketing | $63,537,768 | 14.00% |
8- Delivery | $- | 0.00% |
9- Operation | $2,223,822 | 0.49% |
10- Income Collection | $5,627,631 | 1.24% |
Development Management | $13,615,236 | 3.00% |
Total @DEVDLOP Fees Invoice % From Total Construction Cost | $128,573,212 | 28.33% |
ICCO TOKENS DISTRIBUTION
ITEMS | PERCENTAGE |
---|---|
Advisors | 0.50% |
Bounties Pool | 4.00% |
Public Referrals | 4.00% |
Community Referrals | 3.00% |
Crypto Influencers | 1.00% |
Ambassadors | 1.00% |
Community & Charity Donation | 0.50% |
Frozen & Locked Token | 0.50% |
Reserve For Future Stakeholders | 0.50% |
Fund Liquidity Reserve | 0.50% |
Early Backers | 1.00% |
Angel Investors | 0.50% |
VC Investors | 0.50% |
Private Investors | 0.50% |
Strategic Partner | 0.50% |
Distributed During Pre-ICO | 3.00% |
ICCO TOKEN SUPPLY (Crowd Sale) Distributed During ICO | 10.00% |
ICCO TOKEN SUPPLY (Promotional Community Sale) Distributed During ICO | 68.50% |
Total | 100.00% |
ICO STAGE
ITEMS | DATE |
---|---|
Starting Stage | TBD |
End Stage | TBD |
ROAD MAP
QUARTER | YEAR |
---|---|
Q1 | 2023 |
FUND ALLOCATIONS
Name | Percentage % |
---|---|
Project Concept Development | 50.00% |
Operation Expenses | 15.00% |
Overhead | 5.00% |
Legal & Financial | 5.00% |
Marketing & Events | 15.00% |
PR & Communication | 5.00% |
Administration | 2.00% |
IT & Security | 3.00% |
Total | 100.00% |
- Project Concept Development
- Operation Expenses
- Overhead
- Legal & Financial
- Marketing & Events
- PR & Communication
- Administration
- IT & Security

ADEN BEACH RESIDENCE
FACT SHEET
Project Name | Aden Beach Residence |
---|---|
Project Type | Resort |
Project Class | Project |
Country | Yemen |
Governorate | Aden |
City | Aden |
Plot Number | – |
Land Area | 26,181 |
Project Status | Concept |
Project Concept | Resort |
Year Of Built / Start | – |
Year Of Completion | – |
Grand Floor Area (GFA) | 163,631 |
Net Sellable Area | 130,905 |
Floor Area Ratio (FAR) | 5.00 |
Building Height | 90 |
# Of Floors | 12 |
# Of Buildings | 18 |
# Of Apartments | |
# Of Offices | |
# Of Retails | 15 |
# Of Hotel Rooms | 326 |
# Of Parking Spaces | 1,025 |
Project Official Website |
PROJECT DESCRIPTION
Aden Beach Residence” merges the old with the new. The architectural concept of this project is to preserve the beauty of the red old stone for which the Yemeni architecture is renowned, within a modern architectural concept.
The magnificence of the exterior mixed with the luxury of the interior offers its residents a pleasant and peaceful environment topped with first class services to ensure their comfort and satisfaction.
PROJECT GOOGLE MAP LOCATION
PROJECT TEAM
Architecture | @ARCHITECT |
---|---|
Engineering Consultant | |
Project Management | |
Sub Contractor 1 | |
Sub Contractor 2 | |
Sub Contractor 3 | |
Sub Contractor 4 | |
Sub Contractor 5 | |
Marketing & Sales Agency | @SALES |
Property Management | @FM |
PROJECT COSTS
NAME | AMOUNT | CURRENCY |
---|---|---|
Construction Cost | 229,083,750 | $ |
Project Sales Revenues | 366,534,000 | $ |
Project Yearly Rent Revenues | – | $ |
@DEVELOP Management FEES
ITEMS | PRICE | PERCENTAGE |
---|---|---|
1- Evaluation | $160,359 | 0.07% |
2- Design | $10,308,769 | 4.50% |
3- Planning | $389,442 | 0.17% |
4- Organization | $1,397,411 | 0.61% |
5- Financing Management | $4,581,675 | 2.00% |
6- Execution as PM & CM | $5,154,384 | 2.25% |
7- Marketing | $32,071,725 | 14.00% |
8- Delivery | $- | 0.00% |
9- Operation | $1,122,510 | 0.49% |
10- Income Collection | $2,840,639 | 1.24% |
Development Management | $6,872,513 | 3.00% |
Total @WORLD Invoice % From Total Construction Cost | $64,899,426 | 28.33% |
ICCO TOKENS DISTRIBUTION
ITEMS | PERCENTAGE % |
---|---|
Advisors | 0.50% |
Bounties Pool | 4.00% |
Public Referrals | 4.00% |
Community Referrals | 3.00% |
Crypto Influencers | 1.00% |
Ambassadors | 1.00% |
Community & Charity Donation | 0.50% |
Frozen & Locked Token | 0.50% |
Reserve For Future Stakeholders | 0.50% |
Fund Liquidity Reserve | 0.50% |
Early Backers | 1.00% |
Angel Investors | 0.50% |
VC Investors | 0.50% |
Private Investors | 0.50% |
Strategic Partner | 0.50% |
Distributed During Pre-ICO | 5.00% |
ICO TOKEN SUPPLY (Crowd Sale) Distributed During ICO | 10.00% |
ICO TOKEN SUPPLY (Promotional Community Sale) Distributed During ICO | 66.50% |
Total | 100.00% |
ICCO STAGE
ITEMS | DATE |
---|---|
Starting Stage | TBD |
End Stage | TBD |
PROJECT ROAD MAP
QUARTER | YEAR |
---|---|
Q3 | 2029 |
FUND ALLOCATIONS
Name | Percentage % |
---|---|
Project Concept Development | 50.00% |
Operation Expenses | 15.00% |
Overhead | 5.00% |
Legal & Financial | 5.00% |
Marketing & Events | 15.00% |
PR & Communication | 5.00% |
Administration | 2.00% |
IT & Security | 3.00% |
Total | 100.00% |
- Project Development
- Operation Expenses
- Overhead
- Legal & Financial
- Marketing & Events
- PR & Communication
- Administration
- IT & Security

AL HADA GATE
FACT SHEET
Project Name | Al Hada Gate |
---|---|
Project Type | Resort |
Project Class | Project |
Country | KSA |
Governorate | Taief |
City | Al Hada |
Plot Number | – |
Land Area | 994,000 |
Project Status | Concept |
Project Concept | Resort |
Year Of Built / Start | – |
Year Of Completion | – |
Grand Floor Area (GFA) | 843,750 |
Net Sellable Area | 675,000 |
Floor Area Ratio (FAR) | 0.68 |
Building Height | 24 |
# Of Floors | 4 |
# Of Buildings | |
# Of Apartments | |
# Of Offices | |
# Of Retails | |
# Of Hotel Rooms | 5,625 |
# Of Parking Spaces | 6,000 |
Project Official Website |
PROJECT DESCRIPTION
PROJECT GOOGLE MAP LOCATION
PROJECT TEAM
Architecture | @ARCHITECT |
---|---|
Engineering Consultant | |
Project Management | |
Sub Contractor 1 | |
Sub Contractor 2 | |
Sub Contractor 3 | |
Sub Contractor 4 | |
Sub Contractor 5 | |
Marketing & Sales Agency | @SALES |
Property Management | @FM |
PROJECT COSTS
NAME | AMOUNT | CURRENCY |
---|---|---|
Construction Cost | 843,750,000 | $ |
Project Sales Revenues | 1,350,000,000 | $ |
Project Yearly Rent Revenues | – | $ |
@DEVELOP Management FEES
ITEMS | PRICE | PERCENTAGE |
---|---|---|
1- Evaluation | $590,625 | 0.07% |
2- Design | $37,968,750 | 4.50% |
3- Planning | $1,434,375 | 0.17% |
4- Organization | $5,146,875 | 0.61% |
5- Financing Management | $16,875,000 | 2.00% |
6- Execution as PM & CM | $18,984,375 | 2.25% |
7- Marketing | $118,125,000 | 14.00% |
8- Delivery | $- | 0.00% |
9- Operation | $4,134,375 | 0.49% |
10- Income Collection | $10,462,500 | 1.24% |
Development Management | $25,312,500 | 3.00% |
Total @WORLD Invoice % From Total Construction Cost | $239,034,375 | 28.33% |
ICCO TOKENS DISTRIBUTION
ITEMS | PERCENTAGE % |
---|---|
Advisors | 0.50% |
Bounties Pool | 4.00% |
Public Referrals | 4.00% |
Community Referrals | 3.00% |
Crypto Influencers | 1.00% |
Ambassadors | 1.00% |
Community & Charity Donation | 0.50% |
Frozen & Locked Token | 0.50% |
Reserve For Future Stakeholders | 0.50% |
Fund Liquidity Reserve | 0.50% |
Early Backers | 1.00% |
Angel Investors | 0.50% |
VC Investors | 0.50% |
Private Investors | 0.50% |
Strategic Partner | 0.50% |
Distributed During Pre-ICO | 5.00% |
ICCO TOKEN SUPPLY (Crowd Sale) Distributed During ICCO | 10.00% |
ICCO TOKEN SUPPLY (Promotional Community Sale) Distributed During ICCO | 66.50% |
Total | 100.00% |
ICCO STAGE
ITEMS | DATE |
---|---|
Starting Stage | TBD |
End Stage | TBD |
PROJECT ROAD MAP
QUARTER | YEAR |
---|---|
Q1 | 2030 |
FUND ALLOCATIONS
Name | Percentage % |
---|---|
Project Concept Development | 50.00% |
Operation Expenses | 15.00% |
Overhead | 5.00% |
Legal & Financial | 5.00% |
Marketing & Events | 15.00% |
PR & Communication | 5.00% |
Administration | 2.00% |
IT & Security | 3.00% |
Total | 100.00% |
- Project Development
- Operation Expenses
- Overhead
- Legal & Financial
- Marketing & Events
- PR & Communication
- Administration
- IT & Security

BOATEL
Project Name | BOATEL |
---|---|
Project Type | Hotel Apartments Building |
Project Class | Product |
Country | Worldwide |
Governorate | Worldwide |
City | Worldwide |
Plot Number | – |
Land Area | 48,400 |
Project Status | Concept |
Project Concept | 4 Floors Hotel |
Year Of Built / Start | – |
Year Of Completion | – |
Grand Floor Area (GFA) | 117,544 |
Net Sellable Area | 84,544 |
Floor Area Ratio (FAR) | 1.75 |
Building Height | 20 |
# Of Floors | 4 |
# Of Buildings | 1 |
# Of Apartments | |
# Of Offices | 7 |
# Of Retails | 86 |
# Of Hotel Rooms | 1,276 |
# Of Parking Spaces | 1,389 |
Project Official Website |
PROJECT DESCRIPTION
The hotel will be situated in important cities in the world and provides an unique experience of visit a yachts, restaurant, or accommodation in adequately equipped rooms.
PROJECT GOOGLE MAP LOCATION
PROJECT TEAM
Architecture | @ARCHITECT |
---|---|
Engineering Consultant | |
Project Management | |
Sub Contractor 1 | |
Sub Contractor 2 | |
Sub Contractor 3 | |
Sub Contractor 4 | |
Sub Contractor 5 | |
Marketing & Sales Agency | @SALES |
Property Management | @FM |
PROJECT COSTS
NAME | AMOUNT | CURRENCY |
---|---|---|
Construction Cost | 141,052,800 | $ |
Project Sales Revenues | 282,105,600 | $ |
Project Yearly Rent Revenues | – | $ |
@DEVELOP Management FEES
ITEMS | PRICE | PERCENTAGE |
---|---|---|
1- Evaluation | $98,737 | 0.07% |
2- Design | $6,347,376 | 4.50% |
3- Planning | $239,790 | 0.17% |
4- Organization | $860,422 | 0.61% |
5- Financing Management | $2,821,056 | 2.00% |
6- Execution as PM & CM | $3,173,688 | 2.25% |
7- Marketing | $19,747,392 | 14.00% |
8- Delivery | $- | 0.00% |
9- Operation | $691,159 | 0.49% |
10- Income Collection | $1,749,055 | 1.24% |
Development Management | $4,231,584 | 3.00% |
Total @WORLD Invoice % From Total Construction Cost | $39,960,258 | 28.33% |
ICCO TOKENS DISTRIBUTION
ITEMS | PERCENTAGE % |
---|---|
Advisors | 0.50% |
Bounties Pool | 4.00% |
Public Referrals | 4.00% |
Community Referrals | 3.00% |
Crypto Influencers | 1.00% |
Ambassadors | 1.00% |
Community & Charity Donation | 0.50% |
Frozen & Locked Token | 0.50% |
Reserve For Future Stakeholders | 0.50% |
Fund Liquidity Reserve | 0.50% |
Early Backers | 1.00% |
Angel Investors | 0.50% |
VC Investors | 0.50% |
Private Investors | 0.50% |
Strategic Partner | 0.50% |
Distributed During Pre-ICO | 5.00% |
ICCO TOKEN SUPPLY (Crowd Sale) Distributed During ICCO | 10.00% |
ICCO TOKEN SUPPLY (Promotional Community Sale) Distributed During ICCO | 66.50% |
Total | 100.00% |
ICCO STAGE
ITEMS | DATE |
---|---|
Starting Stage | TBD |
End Stage | TBD |
PROJECT ROAD MAP
QUARTER | Year |
---|---|
Q3 | 2023 |
FUND ALLOCATIONS
Name | Percentage % |
---|---|
Project Concept Development | 50.00% |
Operation Expenses | 15.00% |
Overhead | 5.00% |
Legal & Financial | 5.00% |
Marketing & Events | 15.00% |
PR & Communication | 5.00% |
Administration | 2.00% |
IT & Security | 3.00% |
Total | 100.00% |
- Project Development
- Operation Expenses
- Overhead
- Legal & Financial
- Marketing & Events
- PR & Communication
- Administration
- IT & Security

Dubai DECOR CITY
Project Name | Dubai Decor City |
---|---|
Project Type | Resort |
Project Class | Project |
Country | UAE |
Governorate | Dubai |
City | |
Plot Number | |
Land Area | 1,042,327 |
Project Status | Concept |
Project Concept | Resort |
Year Of Built / Start | – |
Year Of Completion | – |
Grand Floor Area (GFA) | 1,268,616 |
Net Sellable Area | 757,111 |
Floor Area Ratio (FAR) | 0.73 |
Building Height | 8 |
# Of Floors | 2 |
# Of Buildings | |
# Of Apartments | |
# Of Offices | |
# Of Retails | |
# Of Hotel Rooms | 31,987 |
# Of Parking Spaces | 40,000 |
Project Official Website |
PROJECT DESCRIPTION
The idea was based on creating an environment that is heat insulated from the outside through an interior courtyard, with the length of the mote l overlooking all the rooms Most of the underground floors were placed to provide a less warm atmosphere The motel was designed to form a wall from the outside and fortresses to protect the resort from the outside
PROJECT GOOGLE MAP LOCATION
PROJECT TEAM
Architecture | @ARCHITECT |
---|---|
Engineering Consultant | |
Project Management | |
Sub Contractor 1 | |
Sub Contractor 2 | |
Sub Contractor 3 | |
Sub Contractor 4 | |
Sub Contractor 5 | |
Marketing & Sales Agency | @SALES |
Property Management | @FM |
PROJECT COSTS
NAME | AMOUNT | CURRENCY |
---|---|---|
Construction Cost | 1,649,200,800 | $ |
Project Sales Revenues | 2,721,181,320 | $ |
Project Yearly Rent Revenues | – | $ |
@DEVELOP Management FEES
ITEMS | PRICE | PERCENTAGE |
---|---|---|
1- Evaluation | $1,154,441 | 0.07% |
2- Design | $74,214,036 | 4.50% |
3- Planning | $2,803,641 | 0.17% |
4- Organization | $10,060,125 | 0.61% |
5- Financing Management | $32,984,016 | 2.00% |
6- Execution as PM & CM | $37,107,018 | 2.25% |
7- Marketing | $230,888,112 | 14.00% |
8- Delivery | $- | 0.00% |
9- Operation | $8,081,084 | 0.49% |
10- Income Collection | $20,450,090 | 1.24% |
Development Management | $49,476,024 | 3.00% |
Total @DEVOLOP Invoice % From Total Construction Cost | $467,218,587 | 28.33% |
ICCO TOKENS DISTRIBUTION
ITEMS | PERCENTAGE % |
---|---|
Advisors | 0.50% |
Bounties Pool | 4.00% |
Public Referrals | 4.00% |
Community Referrals | 3.00% |
Crypto Influencers | 1.00% |
Ambassadors | 1.00% |
Community & Charity Donation | 0.50% |
Frozen & Locked Token | 0.50% |
Reserve For Future Stakeholders | 0.50% |
Fund Liquidity Reserve | 0.50% |
Early Backers | 1.00% |
Angel Investors | 0.50% |
VC Investors | 0.50% |
Private Investors | 0.50% |
Strategic Partner | 0.50% |
Distributed During Pre-ICO | 5.00% |
ICO TOKEN SUPPLY (Crowd Sale) Distributed During ICO | 10.00% |
ICO TOKEN SUPPLY (Promotional Community Sale) Distributed During ICO | 66.50% |
Total | 100.00% |
ICCO STAGE
ITEMS | DATE |
---|---|
Starting Stage | TBD |
End Stage | TBD |
PROJECT ROAD MAP
QUARTER | YEAR |
---|---|
Q3 | 2024 |
FUND ALLOCATIONS
Name | Percentage % |
---|---|
Project Concept Development | 50.00% |
Operation Expenses | 15.00% |
Overhead | 5.00% |
Legal & Financial | 5.00% |
Marketing & Events | 15.00% |
PR & Communication | 5.00% |
Administration | 2.00% |
IT & Security | 3.00% |
Total | 100.00% |
- Project Development
- Operation Expenses
- Overhead
- Legal & Financial
- Marketing & Events
- PR & Communication
- Administration
- IT & Security